Sam's RV-14A Build
Home
(7444.5 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Formed and assembled air ramps to left and right baffles. Started assembling baffle gaskets.
28 Dec 2022
4.5 hours
FWF
Share
Riveted bottom skin
28 Dec 2022
5 hours
Section 20
Share
Riveted alternate air inlet to snorkel. Assembled filter bypass door. Installed snorkel to fuel injector and baffle.
27 Dec 2022
2 hours
Section 47
Share
Adjusted
21 Dec 2022
5 hours
FWF
Share
Mounted Snorkel (cut and trimmed as needed). Floxed snorkel to frame.
20 Dec 2022
6 hours
FWF
Share
Installed forward left and right baffles. Installed wire baffle braces.
19 Dec 2022
3 hours
FWF
Share
Riveted bottom left wing skin
16 Dec 2022
6.5 hours
Section 20
Share
Continued baffle work. Mounted left and right rear bales to engine. Applied silicon to left and right front baffles.
15 Dec 2022
5 hours
FWF
Share
Installed nut plates on fairings and louvers
15 Dec 2022
5.5 hours
Section 46
Share
Trimmed and drilled intersection fairings
14 Dec 2022
6 hours
Section 46
Share