(1063.5 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
I prepared and then match drilled control sticks to control stick base (both left and right). Left control stick base was bolted to control stick column. Right side was not done at this time (back-ordered parts)z. Elevator push rod was inserted and bolted to bell crank. All roll bar parts were identified, prepped, and cleaned for priming.
18 Feb 2022
4.5 hours
Section 36
Share
I removed all paper and tape from last painting session. Cleaned up and deburred idler arm bracket. Riveted bell crank and assembled bell rank assembly. Mount bellcrank assembly onto battery angles. Bolted pushrods to idler arm assembly. Torqued and torque sealed all parts. Drilled holes into control sticks.
17 Feb 2022
6 hours
Section 36
Share
Completed push rods. Taped fuselage to paint interior.
11 Feb 2022
6 hours
Section 36
Share
Painted interior.
11 Feb 2022
1 hours
Section 36
Share
Drill all pushrod rivet holes. Prime all parts for elevator system.
9 Feb 2022
3 hours
Section 36
Share