(1063.5 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Replaced broken elevator trim connector with inline molex connectors. Tested operation.
17 Aug 2023
2 hours
Other
Share
Replaced broken elevator trim connector with inline molex connectors. Tested operation.
17 Aug 2023
2 hours
Other
Share
Worked on cowling installation. Installed wheel pants and intersection fairings.
4 Mar 2023
4.5 hours
Other
Share
Install interior and engine cowling.
2 Mar 2023
5.5 hours
Other
Share
Magnetometer/AHRS calibration. Fixed control stick rubbing on switches. Corrected seat back installation. AP configuration and checkout.
26 Feb 2023
8 hours
Other
Share
Emp fairing. Data plate. Airframe labeling. Fuel calibration. EFIS parameter/limits setup
25 Feb 2023
8 hours
Other
Share
Continued landing light installation. Finished right flap installation. Temporarily installed left and right seat pans and seats. Added oil to engine. Checked oil pressure. Added fuel to left and right fuel tanks. Tested fuel flow. Successful engine start. Adjusted low end throttle.
13 Feb 2023
7.5 hours
Other
Share
Fabricated fuel lines. Started center aileron pushrod installation
9 Feb 2023
2 hours
Other
Share
Painted interior parts
7 Feb 2023
2.5 hours
Other
Share
Installed the eight spar bolts in center section. Added break fluid to Bering brakes and bled brakes.
27 May 2022
5 hours
Other
Share