Sam's RV-14A Build
Home
(1063.5 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Finished wing root fairings. Fabricated and installed tank vents. Put high temp silicon on firewall wire entry. Started installation of empennage fairing.
21 Feb 2023
5 hours
Wings
Share
Worked on wing root farings. Completed left side.
20 Feb 2023
5.5 hours
Wings
Share
Weighed aircraft, again. Trouble shoot pitot tube. Worked on wing root fairing.
17 Feb 2023
5.5 hours
Wings
Share
Completed landing light and wing tip installation. Partial assemble airplane and complete weight and balance.
16 Feb 2023
5 hours
Wings
Share
Continued work on landing lights. Riveted light housings to wings. Wired and tested left light.
14 Feb 2023
3 hours
Wings
Share
Finished aileron pushrods and tested operation. Started landing light installation. Worked on empennage and wing root fairings.
10 Feb 2023
7 hours
Wings
Share
Attached rudder faring. Assembled pushrods for ailerons. Install left flap pushrod.
9 Feb 2023
5 hours
Wings
Share
Connect electrical and pitot/AOA to wings. Fixed swapped wires. Tested operation. Sand and paint vertical and horizontal stab tips. Torque wing bolts.
7 Feb 2023
4.5 hours
Wings
Share
Fiberglass rudder fairing and vertical stabilizer cap. Install wings. Pressure test left tank.
6 Feb 2023
5 hours
Wings
Share
Adjust and safety wire alternator. Continue work on spark plug wires. Install right and left fuel tank floats. Idyll stall all fuel tank fittings. Install pitot tube and completed wiring.
26 Jan 2023
7 hours
Wings
Share