Sam's RV-14A Build
Home
(2127 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Magnetometer/AHRS calibration. Fixed control stick rubbing on switches. Corrected seat back installation. AP configuration and checkout.
26 Feb 2023
8 hours
Other
Share
Calibrate tanks.
25 Feb 2023
2 hours
Avionics
Share
Emp fairing. Data plate. Airframe labeling. Fuel calibration. EFIS parameter/limits setup
25 Feb 2023
8 hours
Other
Share
Label panel. Install N number on fuselage.
24 Feb 2023
5.5 hours
Avionics
Share
Finished wing root fairings. Fabricated and installed tank vents. Put high temp silicon on firewall wire entry. Started installation of empennage fairing.
21 Feb 2023
5 hours
Wings
Share
Worked on wing root farings. Completed left side.
20 Feb 2023
5.5 hours
Wings
Share
Weighed aircraft, again. Trouble shoot pitot tube. Worked on wing root fairing.
17 Feb 2023
5.5 hours
Wings
Share
Completed landing light and wing tip installation. Partial assemble airplane and complete weight and balance.
16 Feb 2023
5 hours
Wings
Share
Continued work on landing lights. Riveted light housings to wings. Wired and tested left light.
14 Feb 2023
3 hours
Wings
Share
Continued landing light installation. Finished right flap installation. Temporarily installed left and right seat pans and seats. Added oil to engine. Checked oil pressure. Added fuel to left and right fuel tanks. Tested fuel flow. Successful engine start. Adjusted low end throttle.
13 Feb 2023
7.5 hours
Other
Share