Sam's RV-14A Build
Home
(13825.5 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Completed wiring Can Bus
7 Jul 2022
4 hours
Avionics
Share
Installed GDU GPS antenna. Ran can bus to GAD29,G5, GSA25, GDU
7 Jul 2022
5.5 hours
Avionics
Share
Connected configure module to GNX. Wired power to GNX. Wired power to GTR200. Tested power connections to all Garmin components. Started Canbus wiring to GMU11, GAD27, GEA24, and Pitch servo.
1 Jul 2022
5 hours
Avionics
Share
Ran transponder antenna wire. Ran power and ground to GTR200. Adjust GTR200 tray and affix back plate. Rerouted Wire F2240 out left fuselage for pitch servo to GMU11.
30 Jun 2022
6 hours
Avionics
Share
Ran antenna wire for GP and Com. Ran static line. Ran ELT switch wire. Installed ELT antenna. Ran power wire for GMC 507 and Autopilot Servos. Ran TO/GA wire to GMC 507. Ran power wires to GMU 11.
28 Jun 2022
6 hours
Avionics
Share
Wired power to GEA, GAD29, Copilot GDU, test wiring.
27 Jun 2022
4.5 hours
Avionics
Share
Wired power and ground for pitch trim, roll trim, flaps, GSU25, GDU
23 Jun 2022
6.5 hours
Avionics
Share
Assembled fuel, oil, and manifold and pressure manifold and mounted to firewall. Finished and tested master solenoid. Started wiring GSU25C. Installed G5 battery and tested.
16 Jun 2022
4 hours
Avionics
Share
Installed master solenoid. Installed alternator fuse holder. Fabricated all wires.
14 Jun 2022
6 hours
Avionics
Share
Installed transponder and comm antennas. Fabricated backer plane and install GPS antenna. Run ground wire to master switch.
13 Jun 2022
5 hours
Avionics
Share
� 2020
Design
pdevty