Sam's RV-14A Build
Home
(10635 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Sanded and drilled cowl. Fixed defective cowl and remade hinges. Attached angle iron to to cowl. Trimmed aft edge to fit.
17 Nov 2022
5.5 hours
Section 43
Share
Primed and assembled aileron pushrods.
16 Nov 2022
5 hours
Section 43
Share
Sanded cowl openings. Prepped interior parts. Fabricated and primed push rods
15 Nov 2022
5.5 hours
Section 41
Share
Finished installing control cables. Connected and tested cooling flap. Finished left heater vent.
14 Nov 2022
5 hours
Section 60
Share
Trimmed cowl, prepped and primed parts
14 Nov 2022
6 hours
Section 43
Share
Completed cowl flap, installed control cable bracket (vinyl covered), prop gov cable, alt air cable, and both heater cables. Connected left heater cable to heat door.
11 Nov 2022
6 hours
Section 50
Share
Started assembly of cowl flap. Installed needed nut plates to fuselage. Installed fuel pump overflow tube.
11 Nov 2022
5.5 hours
Section 53
Share
Fabricated hinges and hinge pins. Removed eyelets. Started trimming cowl
10 Nov 2022
5.5 hours
Section 45
Share
Put washers in tail wheel, fabricated and installed vents
9 Nov 2022
5.5 hours
Section 29
Share
Wired panel lights and canopy switch to GEA. Installed all oil and fuel fittings to back of engine. Installed engine to fuselage.
9 Nov 2022
6.5 hours
Section 43
Share
� 2020