Sam's RV-14A Build
Home
(2127 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Completed exhaust install. Started heat exchanger installation.
4 Jan 2023
5 hours
FWF
Share
Used RTV to seal gaps between engine and baffles. Cut heater Scat tubes. Placed cabin heat “T”. Assembled exhaust tubes and prepared for installation.
3 Jan 2023
5 hours
FWF
Share
Clecoed all rubber to baffles. Install magneto blast tubes.
29 Dec 2022
2 hours
FWF
Share
Formed and assembled air ramps to left and right baffles. Started assembling baffle gaskets.
28 Dec 2022
4.5 hours
FWF
Share
Adjusted
21 Dec 2022
5 hours
FWF
Share
Mounted Snorkel (cut and trimmed as needed). Floxed snorkel to frame.
20 Dec 2022
6 hours
FWF
Share
Installed forward left and right baffles. Installed wire baffle braces.
19 Dec 2022
3 hours
FWF
Share
Continued baffle work. Mounted left and right rear bales to engine. Applied silicon to left and right front baffles.
15 Dec 2022
5 hours
FWF
Share
Continue work on baffles.
13 Dec 2022
5.5 hours
FWF
Share
Completed left and right rear baffles
12 Dec 2022
5.5 hours
FWF
Share