Sam's RV-14A Build
Home
(4254 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Installed master solenoid. Installed alternator fuse holder. Fabricated all wires.
14 Jun 2022
6 hours
Avionics
Share
Installed transponder and comm antennas. Fabricated backer plane and install GPS antenna. Run ground wire to master switch.
13 Jun 2022
5 hours
Avionics
Share
Installed ground lugs and fuse holder. Wired back-up battery switch. Ran B/U connections to GEA24 and Pilot GSU. Wired config module in GSU connector. Wired 12v discreet to GEA. Tested connections.
9 Jun 2022
7 hours
Avionics
Share
Install GEA24, GAD27, GAD29, G5, ELT switch, TOGA switch, and dimmer. Drill holes for wires in sub panel. Solder wires to dimmer and TOGA. Install all switches in panel. Sort wires in back-up batter harness.
8 Jun 2022
6.5 hours
Avionics
Share
Changed brake line fittings to AN3. Vinyl wrapped instrument panel in flat black. Mounted back-up battery.
6 Jun 2022
5 hours
Avionics
Share
Finished cutting holes in panel blanks. Drilled and screwed radio and gps trays to panel. Drilled and tapped holes for ELT switch. Test fit components.
1 Jun 2022
5.5 hours
Avionics
Share
Change two rivets to 470s. Layout instrument panel. Drill holes to size. Cut screen, ELT switch, and G5 holes.
31 May 2022
4.5 hours