Sam's RV-14A Build
Home
(2127 Total Hrs)
Avionics
(164.5 Hrs)
Empennage
(16 Hrs)
Fuselage
(8.5 Hrs)
Fwf
(112.5 Hrs)
Inventory
(4 Hrs)
Other
(71 Hrs)
Section 10
(57 Hrs)
Section 11
(6 Hrs)
Section 12
(4.5 Hrs)
Section 14
(5 Hrs)
Section 17
(9.5 Hrs)
Section 19
(4 Hrs)
Section 20
(28 Hrs)
Section 22
(5.5 Hrs)
Section 23
(15 Hrs)
Section 24
(5.5 Hrs)
Section 25
(5.5 Hrs)
Section 29
(5.5 Hrs)
Section 30
(19.5 Hrs)
Section 31
(14 Hrs)
Section 32
(22 Hrs)
Section 33
(9 Hrs)
Section 34
(6.5 Hrs)
Section 36
(20.5 Hrs)
Section 37
(15 Hrs)
Section 38
(96 Hrs)
Section 39
(3.5 Hrs)
Section 40
(11 Hrs)
Section 41
(5.5 Hrs)
Section 43
(25 Hrs)
Section 44
(17.5 Hrs)
Section 45
(21.5 Hrs)
Section 46
(43.5 Hrs)
Section 47
(2 Hrs)
Section 50
(6 Hrs)
Section 53
(5.5 Hrs)
Section 55
(4.5 Hrs)
Section 56
(2.5 Hrs)
Section 6
(8 Hrs)
Section 60
(5 Hrs)
Section 63
(3.5 Hrs)
Section 7
(19 Hrs)
Section 8
(31 Hrs)
Section 9
(48 Hrs)
Wings
(71 Hrs)
Finished installing flap POS. Tested operation. Installed pitot and AOA tubes
28 Oct 2022
3 hours
Avionics
Share
Continues working on flap configuration.
27 Oct 2022
1 hours
Avionics
Share
Installed start switch. Installed flap POS
25 Oct 2022
1 hours
Avionics
Share
Completed wiring for landing lights and pitot heat sense.
2 Aug 2022
1 hours
Avionics
Share
Finished wiring stick grips. Tested connections. Wired left and right landing lightsz
22 Jul 2022
3.5 hours
Avionics
Share
Ran wires for flaps. Connected flap motor power.
21 Jul 2022
2 hours
Avionics
Share
Finished ELT wiring. Tested operation.
20 Jul 2022
1.5 hours
Avionics
Share
Mounter ELT. Wired ELT plug. Wired power and RS232 to ELT
18 Jul 2022
5 hours
Avionics
Share
Assemble back shells for GNX and GTR200. Adjust avionics racks. Install all Garmin components. Set-up communication software for GDU and GNX. Test audio inputs.
14 Jul 2022
6.5 hours
Avionics
Share
Completed wiring of GNX-375.
12 Jul 2022
7 hours
Avionics
Share