Connected tack wire. Completed assembly of all backshells. Connected and tested right P-Mag. Ran all P-mag manifold pressure lines. Installed Pilot and co-Pilot screens. Install pitot, AOA, and static lines.
19 Jan 2023 8.5 hours
FWF

Design pdevty