I prepared and then match drilled control sticks to control stick base (both left and right). Left control stick base was bolted to control stick column. Right side was not done at this time (back-ordered parts)z. Elevator push rod was inserted and bolted to bell crank. All roll bar parts were identified, prepped, and cleaned for priming.
18 Feb 2022 4.5 hours

Design pdevty